Barry, Thank You For The Opportunity to Bid on Your Project.
“At Arizona Casita Builders, we have a profoundly ingrained vision for providing the best ADU, Guest House and casita building services”
With over 25+ years of Casita design and building experience, we have become Arizona’s most trusted casita builder. From the initial concept to design to the finished garage, we ensure our clients get exactly what they need and want in their new ADU or casita build.
- Quality Control System, 100% Satisfaction Guarantee
- Highly Professional Project Management Software
- Unrivaled workmanship, We stand behind our work
Jeff Felt
Founder, CEO
Luxe Development Group Inc DBA Arizona Casita Builders will perform the following:
For The Amount Of $123,108
- We Will Build A 480 sq ft Workout Room
Permits and Fees
- Luxe Development Group Inc. DBA Arizona Casita Builders shall complete permit applications and make submissions to the municipality for all building and mechanical permits required. Standard permit fees have been excluded and will be billed as a change order upon request per the municipality.
- Engineered plans have been included in your proposal and agreement.
Blue Stake
- Requirement by the state of Arizona to check for underground utilities before we dig.
Termite Pre-Treatment
- Ground will be pre-treated prior to construction and is included in pricing with a 3 year warranty.
Grading and Excavation
- Excavate for foundation per architectural plan drawings and all excavated soils to be stockpiled for use during back fill. Unsuitable soil conditions at, or above, plan bottom are unknowns and cannot be budgeted for prior to excavation. ie. Rock, soft clays, sinkholes, etc. these will incur additional costs of $225 per hour
- It is unknown whether or not we will require fill dirt in order to bring your new build to meet county requirements. As such, Luxe Development Group Inc. DBA Arizona Garage Builders cannot include any fill related items into the original bid, as each build and area are unique. Any fill needed to bring your building to level will be charged as a change order at $3 per square foot plus $35 per ton for fill dirt.
- Builder will back fill foundation with existing excavated soils. Excess soils shall be graded out on property if possible, if not possible to grade out, expenses for hauling off-site any excess soils will be charged to the client at $225 an hour plus dump fees.
- Luxe Development Group Inc DBA Arizona Garage Builders Inc. will not be held responsible for damage to or replacement of irrigation lines, sprinkler lines, water lines, gas lines, electric lines, pool lines, phone lines or cable TV lines not shown on blue stake prior to excavation.
- If we get into a HARD DIG situation, client will be responsible for extra costs associated with hard dig.
Trenching
- For trenching and/or pulling of electrical lines, plumbing lines, gas lines, water lines etc. there will be a charge of $35 per ft. This is based on having a clear run (no obstacles) such as concrete, brickwork, pavers, trees etc. this would incur additional fees at $225 per hour for labor and equipment.
- If Hand-trenching is required, this is billed at $75 per ft.
Framing
- All lumber and framing materials sized and spaced per approved construction drawings. Materials, where applicable, to be kiln dried.
- Wall sheathing shall be oriented strand board installed per code using H clips where applicable. 2×6 Construction. Full Shear.
- Due to the fluctuating lumber costs, the lumber portion of your quote is valid for 7 days.
Concrete
- Poured concrete per engineered plans to include footings with #4 rebar, forms, and slab poured at 3500psi. 4" slab.
Roofing
- 26 Gauge Metal roofing to be installed per engineered plans.
- Client to choose from a selection of colors.
Exterior Finish
- Knock down stucco finish to match home as close as possible. Sand, synthetic stucco, and pop outs are an additional charge.
Electrical
- 8 – 110v GFI outlets
- 6 – LED canister lights
- 1 – Ceiling Fan, $150 allowance
- 1 – 100 amp sub- panel
- 3 – Exterior Sconce lights ($60 allowance per unit)
- Pulling and trenching of electrical lines will be billed at $35 per foot.
Interior Painting
- Color choice of client (Sherwin Williams/Dunn Edwards Paint)
- Single interior body color
Exterior Painting
- Color choice of client (Sherwin Williams)
- Single trim color and single body color
Windows
- N/A, Client Declined
Mechanical
- Install 1 – 1.5 ton Midea (or similar) AC mini split system to include manufacturer warranty.
Insulation
- Install – Open cell spray foam insulation on the Roof deck 5.5″ and interior walls 3.5″ Spray foam insulation is superior to batt insulation and helps with keeping you cooler in the summer and warmer in the winter.
Drywall
- All drywall to be installed with screws in the field, perimeter nails, taped and finished to a level 3 finish (knockdown). Square corners are standard. Bullnose corners and pop-outs are an additional charge.
Baseboards
- 4.25″ White Colonial Base Molding.
Exterior Doors
- 1 – 120″ x 96″ (10080) Multi Panel Sliding door with Screen. $13,000 allowance to be applied towards door, taxes, freight, and installation.
- 1 – 36″ x 96″ (3080) exterior door. Fire Rated to 20 minutes.
- Standard Kwikset HALIFAX door hardware included. Color choice of black, oil rubbed bronze, or satin nickel. Allowance for exterior door handles other than standard $35 per each.
Stained Concrete
- N/A, Client Declined
Dog Door
- Install 1 - Doggie Door
- Allowance of $200 towards doggie door.
Your Project Management
We Use Buildertrend
Buildertrend is online as a website and also as an app for Apple and Android devices. You can use it to keep track of all the activities during your project
Your Own User panel on your phone or desktop
Pay your progress payments within the app
Always see the progress of your project’s schedule
Make change orders right from the app, easy peasy.
See images and video through out the process
Access the app 24/7 so you can be in the know